This is becoming increasingly more needed at least for me.
![](https://i.imgur.com/3mGWwYA.png)
I have these same 6 steps in 8 different deployments. Which means in each of the 8 deployments there are 6 extra steps instead of 1 (starting the one deployment with all 6).
I also have some deployments (installs) that take 2-4 steps. I have "base packages" for teachers, support staff, and students. These packages have apps that some take 2-4 each instead of one calling the main deployment.
If I need to make a change to the main deployment I also have to make it to 3-7 other deployments.
This feature may not be highly requested but I guarantee people want it.
Thanks